{"id":1755,"date":"2025-03-10T12:11:40","date_gmt":"2025-03-10T11:11:40","guid":{"rendered":"https:\/\/terren.hr\/geo-wiki\/decision-on-construction-conditions\/"},"modified":"2025-04-15T13:25:07","modified_gmt":"2025-04-15T11:25:07","slug":"decision-on-construction-conditions","status":"publish","type":"page","link":"https:\/\/terren.hr\/en\/geo-wiki\/decision-on-construction-conditions","title":{"rendered":"Decision on construction conditions"},"content":{"rendered":"\n<div class=\"wp-block-group header layout-break-lg has-global-padding is-layout-constrained wp-container-core-group-is-layout-7198c5c7 wp-block-group-is-layout-constrained\" style=\"margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--vw-medium);padding-bottom:var(--wp--preset--spacing--vw-medium)\">\n<div class=\"wp-block-group layout-break-wp is-layout-flow wp-block-group-is-layout-flow\" style=\"min-height:100%;margin-top:0;margin-bottom:0;padding-top:0;padding-bottom:0\"><h1 class=\"has-text-align-center wp-block-post-title\">Decision on construction conditions<\/h1><\/div>\n<\/div>\n\n<div class=\"wp-block-group section layout-break-lg has-light-beige-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-1866ff05 wp-block-group-is-layout-constrained\" style=\"padding-top:var(--wp--preset--spacing--vw-normal);padding-bottom:var(--wp--preset--spacing--vw-normal)\">\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\">\n<p><strong>A decision on construction conditions<\/strong> (administrative act) is a document required for the construction of a building whose construction (gross) area does not exceed 400 m2 and buildings for carrying out exclusively agricultural activities whose construction (gross) area does not exceed 600 m2.<\/p>\n\n\n\n<p>A decision on construction conditions is issued for the construction of the entire building.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who issues the decision on building conditions?<\/h2>\n\n\n\n<p>The decision on construction conditions is issued by the competent authority of the county or large city, or the City of Zagreb &#8211; depending on the area in which the building is being built.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Documentation for submitting an application<\/h2>\n\n\n\n<p>The investor shall submit a request for issuing a decision on construction conditions in writing, together with the following:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>3 (three) copies of the preliminary design, the situation of which is shown on an appropriate special geodetic base<\/li>\n\n\n\n<li>* proof that the investor has the right to build on the land from which the building plot will be formed, or on an existing building<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Additional documentation is required in the following cases:<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>conceptual design prepared according to foreign regulations &#8211; written report and certificate of validation of the conceptual design<\/li>\n\n\n\n<li>a building in a settlement or part of a settlement that is entered in the register of cultural assets of the Republic of Croatia as a cultural and historical entity, or the building is entered in that register as a cultural asset &#8211; special conditions of the state administration body responsible for cultural assets<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">* Proof from the investor that he has the right to build:<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>an extract from the land register showing that the investor is the owner or holder of the building rights on the building plot or building on which construction is intended<\/li>\n\n\n\n<li>contract or decision of the competent state authority on the basis of which the investor acquired the right of ownership, the right to build or the right of easement<\/li>\n\n\n\n<li>a partnership agreement concluded with the owner of a property, the aim of which is joint construction or reconstruction<\/li>\n\n\n\n<li>concession contract granting the right to build<\/li>\n\n\n\n<li>written consent of the owner of an existing building in the event of reconstruction of that building, unless otherwise provided for by a special law<\/li>\n\n\n\n<li>written consent of the fiduciary owner given to the previous owner of the property who is an investor<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">In the process of issuing a decision on construction conditions, the following is determined:<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Preliminary design prepared in accordance with the spatial plan<\/li>\n\n\n\n<li>Preliminary design prepared in accordance with law and regulations<\/li>\n\n\n\n<li>* building plot regulated &#8211; the competent administrative body will conduct an on-site inspection of the building plot before issuing a decision on construction conditions<\/li>\n\n\n\n<li>planned location and method of connecting the building plot to traffic, utility and other infrastructure<\/li>\n\n\n\n<li>that all necessary documentation is attached to the request<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">* A building plot is considered regulated if it has:<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>access from the traffic area<\/li>\n\n\n\n<li>resolved wastewater drainage<\/li>\n\n\n\n<li>the prescribed number of parking spaces<\/li>\n<\/ul>\n\n\n\n<p>The decision on construction conditions is valid for 2 (two) years, which means that the investor can begin construction within 2 (two) years from the date the decision becomes final.<\/p>\n\n\n\n<p>The validity of the decision may be extended once more for 2 (two) years provided that the conditions under which the decision was issued have not changed.<\/p>\n\n\n\n<p>The competent administrative body is obliged to keep the conceptual design and the decision on construction conditions.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A decision on construction conditions (administrative act) is a document required for the construction of a building whose construction (gross) area does not exceed 400 m2 and buildings for carrying out exclusively agricultural activities whose construction (gross) area does not exceed 600 m2. A decision on construction conditions is issued for the construction of the [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1095,"parent":1704,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"blank","meta":{"kontra_seo_title":"","kontra_seo_description":"","kontra_seo_image":0,"kontra_seo_canonical":"","kontra_seo_disabled":false,"footnotes":""},"tags":[],"class_list":["post-1755","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/pages\/1755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/comments?post=1755"}],"version-history":[{"count":1,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/pages\/1755\/revisions"}],"predecessor-version":[{"id":1757,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/pages\/1755\/revisions\/1757"}],"up":[{"embeddable":true,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/pages\/1704"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/media\/1095"}],"wp:attachment":[{"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/media?parent=1755"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/terren.hr\/en\/wp-json\/wp\/v2\/tags?post=1755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}